国产成人免费在线播放_亚洲AV免费看日韩_国产日产欧产精品精品推荐在线_久久精品国产亚洲日本波多野结衣_最近最好中文字幕电影_国产精品福利在线观看一区_月夜直播视频下载_亚洲欧美综合中文_成 人免费va视频_成年美女18禁黄网站免费_国产一级 片内射视频播放免_久久福利青草免费精品

Focused on the control systems solutions for fluid metering systems, and integrating various types of R & D, manufacturing, precision micro-liquid filling, measurement, atomization, liquid injection etc.

Telephone:
0769-83328418

News center

Contact us

Dongguan Ji kerr automation Technology Co., LTD

Telephone:0769-83328418
Fax:0769-83328428
Email:dgjikeer@126.com
Address:80 Luxi Road, Xixi Village, Liaobu Town, Dongguan City, Guangdong Province

Dongguan Ji kerr automation Technology Co., LTD

common problem

Home > News center > common problem

News center > common problem

Safety specification for Ji kerr liquid injection pumps

Date:2018-11-13  browse:335

Safety specification for Ji kerr liquid injection pumps

You must read our operating instructions before using the equipment.


1. The operator must be specially trained before taking up the post.


2. Assign professional trained maintenance personnel to maintain.


3. Maintenance personnel must read and be familiar with this operation instruction before repair or maintenance.


4. Maintenance personnel must first stop the operation of the equipment and cut off the power supply during maintenance.


5. Safety protection devices and soft protection measures, the whole touch screen takes protective measures to deal with user improper operation, 

so as to ensure that the machine is not damaged. The whole mechanical working part of the ceramic liquid injection pump is in a closed body protection, 

safe and reliable operation, will not hurt people.


6. The machine is equipped with leakage switch, with correct grounding measures, to protect the human body from electric shock.


7. Whether automatic or manual, there is a reliable interlock relationship between the application units of the logic relationship between the front and back action, 

and can not produce misoperation before and after, so as to avoid danger. 8. When the stepper motor is in working state, do not use external force to interfere with it,

 so as to avoid system errors or harm personal safety.


9. When the system alarms, please contact our sales personnel in time to avoid production loss.


10. Work environment


10.1 The stepper motor should be fixed smoothly on the horizontal platform to ensure the stable operation of the stepper motor and the normal operation of the ceramic pump.


10.2 The whole system needs to operate at normal ambient temperature. Due to different liquids, different temperature differences will occur.

 It is necessary to ensure that the temperature of the stepper motor is normal.


11. Other matters


11.1 Inspect the components of the machine for abnormalities before starting each shift.


11.2 Do not attempt to touch the moving parts of the equipment during operation to avoid injury.


11.3 Before operation, please determine whether the liquid storage tank has electrolyte, if not, replace or add.


11.4 In case of emergency during operation, press the stop button immediately to stop the operation of the machine, 

and the machine can be recovered after the fault is rectified.


11.5 Keep the equipment clean and free of debris and utensils.


11.6 Periodically check the fastening screws in all parts, and do not loose them.


11.7 Check the injection accuracy of the injection pump regularly.


11.8 Clean the liquid injection pump regularly (pump core soaked with DMC or alcohol) and clean the stains and residual liquid in all parts of the machine.


11.9 Before placing the machine for a long time, the dirt should be removed.



Dongguan Ji kerr automation Technology Co., LTD

Scan to enter the mobile website

©2018-2020 Dongguan Ji kerr automation Technology Co., LTD copyright  粵ICP備15074133號(hào)  technical support:ytclouds